Site Preparation Guide

Site requirements, electrical specifications, and compressed air requirements for all SOVDA equipment

Looking to get started? This guide covers technical requirements only. For a full walkthrough of your delivery and setup process, visit the Getting Started Guide.

Contents

Introduction

Thank you for choosing SOVDA for your coffee processing needs. This guide will help you prepare your facility with the correct electrical and air utilities ahead of your equipment arriving.

If you have any questions at any stage, please don't hesitate to reach out to your Technical Representative.

The reference to commissioning in this document specifically refers to the Pearl Mini commissioning only

Workflow Considerations

Before your equipment arrives, it's worth taking a moment to consider how it will integrate into your day-to-day operations. Here are the key factors to think through:

Factor What to Consider
Roaster Cooling Tray Some roasters can swivel or adjust the cooling tray outlet direction, others cannot. Factor this into your equipment positioning.
Space Constraints SOVDA equipment is designed with modularity in mind. If your space includes pillars, narrow sections, or other obstacles, contact your Technical Representative for guidance.
Roasting vs. Packaging Space Integrating your roasting and packaging zones wherever possible minimises manual handling and improves efficiency, saving time and labour costs.
Travel Corridors Maintain clear, accessible pathways throughout your workspace to ensure safe and efficient movement during production.

Once you have a clear picture of your intended layout, your Technical Representative can help you refine it further if needed.

 
 

Equipment Dimensions

Pearl Mini (including Lift)

Base Type Height Width Depth
No Base 2710mm 900mm  1095mm
250mm Base 2960mm 900mm   1095mm
400mm Base 3110mm  900mm 1095mm

Pearl Mini (excluding Lift)

Base Type Height Width Depth
No Base 2250mm 900mm 1095mm
250mm Base 2500mm 900mm 1095mm
400mm Base 2650mm 900mm 1095mm

Other Products

Product Height Width Depth
Precision Fill (including Lift) 2946mm 900mm 1095mm
Precision Fill (excluding Lift) 2486mm 780mm  810mm
Precision Fill Mini 1200mm  440mm 608mm
Precision Fill Mini (with Hopper Extension) 1400mm 440mm 608mm
SOVDA Blend 1310mm  1204mm 1387mm
Drop station (excl. Control Box) 1474mm 840mm 702mm

Recommended Clearances

All ceilings must be a minimum of 3300mm. The table below outlines the recommended operational clearances for each product.

Product Front Side Above
Pearl Mini 600mm 600mm (side of screen and/or acceptance chute)
Precision Fill / Precision Fill Mini 600mm
Pump Box 600mm (maintenance access)
SOVDA Blend 600mm (all sides) 600mm (all sides) 850mm

For all products, the control box should be installed within 4 meters of both a power outlet and the control wire connection point. Additionally, we recommend positioning the compressed air inlet within 1.5 meters of your compressed air supply outlet.

Electrical Requirements

SOVDA provides the specifications below for informational purposes only. Regulatory approvals and compliance requirements vary by country, region, and municipality. It is your responsibility to verify that your installation meets all applicable local electrical codes and safety standards, and to consult a qualified electrician before installation. SOVDA disclaims any liability for damages arising from non-compliant installations.

North America

Products must not be hard-wired into a 240v outlet, nor run from a 208v supply. A 120v to 240v step-up transformer is required for 240v equipment.

Product Voltage Breaker / Current Plug Type
Pearl Mini 120v (via transformer stepping up to 240v) 7 amps operating To match transformer
Lift — Standard Vacuum 120v 15 amp breaker / 13 amps operating NEMA 5-15 (Type B)
Lift — SOVDA Vacuum Box 240v 20 amp breaker / 15 amps operating L6-15P
Lift Control Box 120v 1 amp peak NEMA 5-15 (Type B)
Precision Fill & Precision Fill Mini 120v 1 amp operating NEMA 5-15 (Type B)
SOVDA Blend 240v 15 amps nominal L6-20P

Rest of the World

Product Voltage Current
Pearl Mini 240v 4 amps operating
Lift - Standard Vacuum 240v 7 amps operating
Lift - SOVDA Vacuum Box 240v 20 amp breaker / 15 amps operating
Lift Control Box 240v 0.5 amps peak
Precision Fill & Precision Fill Mini 240v 0.5 amps operating
SOVDA Blend 240v 15 amps nominal

 

Compressed Air Requirements

Before your equipment is installed, air lines with shutoff valves must be in place. The air line from the compressor to the furthest shutoff valve should be no longer than 20 metres (65 feet). The final hose from the shutoff valve to the machine must be 3 metres (10 feet) or less. PEX or metal pipe is recommended for the main air line, mounted to the ceiling or wall behind the machines.

We recommend one shutoff valve per lift, and one per machine, positioned within 1.5–3 metres (5–10 feet) of each unit.

Note: The air connection for the Lift is directly adjacent to the cyclone (on top of the machine)

  • If the Lift sends coffee to a Precision Fill or Pearl Mini, put the Lift's shutoff valve next to the other shutoffs.
  • If the Lift loads green coffee into a roaster, put the Lift's shutoff valve near the roaster.

Requirements by Product

Product Pressure Flow Rate Air Connection Notes
Pearl Mini See article See article 16mm push-fit Pearl Mini - Air Compressor Requirements
Precision Fill 0.4mpa 0.004m³/hour 8mm push-fit  
Precision Fill Mini 0.4mpa 0.00025m³/hr 4mm push-fit  
Lift 0.4mpa 0.004m³/hour 8mm push-fit  
SOVDA Blend 0.4mpa 0.017m³/hour 8mm push-fit  

If your roaster already uses a compressor, it will be sufficient for the Precision Fill, Lift, and Blend, you'll simply need to run additional air lines from it.

Next Steps

Once your electrical and air utilities are in place, head back to the Getting Started Guide to continue with your setup.

If you have any questions about the requirements in this guide, contact Technical Service.